favorite
favorite
hide
unhide
flag

Posted

print

Boat Building Project Delayed - $900 (La Pine)

12345
Marine Engine: 350 (5.7L) Chevrolet Vortec (PCM Engines) with 1:1 tranny; approximately 350 hours, as removed from boat SOLD
Okoume BS 1088 plywood, 4 mm thick, 25 sheets.
Some pre-cut white oak frames
Glen-L Barrelback 19'-20' plans
  • do NOT contact me with unsolicited services or offers

post id: 6950193774

posted:

updated:

best of [?]